The "installation" skill you must know: 14 steps of shower room installation
1. Preparation and bottom basin installation: the regular shower room manufacturer will send professional personnel to the door for installation, and the tools will be taken with you, which is more convenient. Bottom basin must be installed carefully, and water test is an essential part. If the house is installed, it will be difficult to make big changes.
2. Preparation before loading: check whether the product packaging is complete, and check whether the configuration is complete after opening. Prepare necessary tools and put them together for easy access. Material preparation: the materials used for the installation of shower room include frame, toughened glass, handle, pulley and other accessories. Tool preparation: many tools are still needed during the installation of shower room. Before installation, it is better to prepare all these tools. The tools used in this installation include tape measure, pencil, impact drill, hammer, electric screwdriver, glue gun, manual screwdriver, wire pliers, etc.
3. Install the bottom basin: assemble the parts of the bottom basin, adjust the level of the bottom basin, and ensure that there is no water in the basin and the basin bottom. The hose can be telescoped with the distance, and the bottom of the basin is firmly connected with the floor drain.
4. Test and protection (important link): after installation, water test shall be carried out to ensure smooth launching. Before the installation of the room, the installed bottom basin shall also be protected in time.
5. Room installation: whether the shower room is safe or not has an important relationship with whether the room is installed normally, whether the positioning and drilling are accurate, whether the accessories are installed properly, whether the waterproof seal is good, etc. all affect the normal use of the product. It is difficult for ordinary people to grasp the strength and angle of installation.
6. Positioning and drilling: make clear the pipe arrangement in the bathroom to prevent the hidden pipeline from being blasted during drilling. Use pencil and level ruler to determine the drilling position of wall aluminum material, and use impact drill to drill holes.
7. Installation of aluminum material (important link): knock in the rubber particles at the drilling hole and lock the aluminum strip on the wall with screws. Pay attention to continuous adjustment while installing to maintain the verticality of aluminum.
8. Fixed glass (important link): lock the glass clamp tightly at the bottom basin drilling hole, the bottom of flat glass or bent glass falls into the glass clamp groove, and slowly push the aluminum material against the wall. Fix it with screws.
9. Installation of pipe jacking: drill holes at corresponding positions above the fixed glass, install (straight / inclined) fixed base and connect the pipe jacking. Fix it on the top of the glass with a bend sleeve.
10. Install the shelf: install the shelf at the measuring position, tighten the laminated nut, fix the laminated glass, and keep it vertical and horizontal. Pay attention to waterproof under the aluminum material of fixed glass.
11. Installation of movable door (important link): generally, holes for wheel installation have been reserved on the sliding door glass. To move the sliding door, we need to use the pulley. First, we need to install the two wheels above the sliding door. After installing the wheels, we need to place them in the corresponding positions, and then debug and install the lower wheels. Install the hardware of the movable door, and install the hinge at the reserved hole of the fixed door. After loading, adjust the axis position of lotus leaf to the best feeling of closing door.
12. Waterproof (important link): install suction strip or water retaining strip on the side or under the glass as required. Use silica gel to seal the joints between aluminum material and wall, glass and bottom basin. After the basic installation of shower room, apply glass glue on the aluminum frame and wall, which can effectively prevent water penetration in the future.
13. Debugging and fastening (important link): check whether each part is comfortable and smooth, and adjust in time if any problem is found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.
14. Closing work: so far, the installation of shower room has been completed, and the final work is closing work. Wipe the whole shower room with a rag, etc., in addition, put away the installation tools, remaining accessories, etc., and pay attention to the finished product protection.